Park City Kashiwanoha Campus The Gate Tower

BY SERVICE
ArchitectureInterior
BY TYPES
Residential
Completion
2016*Tower East
Project name
Park City Kashiwanoha Campus The Gate Tower
Location
148 Kashiwanoha campus,178-4 Wakashiba, Kashiwa-shi, Chiba MAP
Owner
Mitsui Fudosan Residential Co., Ltd. (Tower East), Mitsui Fudosan Co., Ltd. (Tower West)
Total floor area
Tower East:33,853.99㎡、Tower West:38,771.32㎡
Floor, Structure
36F/PF2, RC, S
Project Team
Design Architect / Jun Mitsui & Associates, Design and Supervision / Kumagai Gumi
Photograph
Naoomi Kurozumi

About the Project

The larger a project becomes, the more imperative it is to balance integrity with originality. Additionally, a high-rise building may sometimes need to have presence that resonates with the distant view for the development of a unique townscape.

Park City Kashiwanoha Campus The Gate Tower has been designed to integrate into the already completed Park City Kashiwanoha Campus Nibangai. The design process was a crystallization of the wide-ranging considerations and ideas of the urban design committee, the master architect and other sources.

To prevent the town development from becoming self-contained, the master plan positions walking space called “Green Axis,” which stretches from the station to Kashiwanoha Park and to the University of Tokyo Kashiwa Campus, running through the center of the whole town. Positioned on both sides of the Green “Axis” are the twin towers featuring symmetrical facades, accentuating the presence of the Green Axis not only in the near view but also in the distant view. The twin towers also serve as a gate centering around the station in the grand urban landscape design.

Along the Green Axis, large and small parks for different purposes as well as branching passages are arranged, and buildings are erected in a way to embrace the external space specific to the site. The external space and facades have been created in an integrated manner to provide stages for people’s lifestyles.

Tower East was completed in December 2016, and Tower West will be completed in January 2018.